Save $480 vs contractor estimate
One-timeInstant accessStripe securePDF included
★★★★★4.9/5· 2,400+ verified purchases
“Same quality as the $300 estimate I was quoted — for $20.”
MT
Marcus T. — Austin, TX · 2,100 sq ft
✓ Verified
2026 US Construction Data — Updated Monthly Know your exact
build cost, before you
hire anyone.
★★★★★4.9/5from 2,400+ verified purchases
“My contractor confirmed every number was accurate. Same quality as the $300 estimate I was quoted.”
“The labor vs material split saved me from being lowballed on framing. Knew exactly what to expect.”
“Uploaded my floor plan and got my full estimate in 4 minutes. Numbers matched my architect exactly.”
✓
14-category CSI breakdown
Foundation to finishes — every line item with labor & materials
✓
Labor vs material split
Know your numbers before you negotiate with any contractor
✓
State cost multipliers applied
All 50 states — adjusted precisely to your zip code
✓
Mortgage estimate at 6.8%
Monthly payment, loan amount & down payment calculated
✓
GC overhead & contingency
15% contractor markup + 5% contingency included
✓
2026 lumber & tariff notes
Current market conditions affecting your budget
✓
Instant PDF + email delivery
Share with your contractor, lender, or architect
Save $480 vs contractor estimate
What's inside your report
14 categories. Every dollar explained.
Div 01
General Conditions
~5%
Div 06
Structural Framing
~11%
Div 11
Drywall & Ceilings
~3%
Div 18
Cabinetry & Finishes
~4%
How it works
3 steps. Under 3 minutes.
01
Enter your location
Zip code for state-specific pricing. Or upload your floor plan for automatic room and sqft detection.
02
Answer 8 quick questions
Square footage, foundation type, finish level, roof, exterior, and extras. Takes about 60 seconds.
03
Get your full report
14-category breakdown, labor vs materials, mortgage estimate, and instant PDF download.
★★★★★4.9 out of 5from 2,400+ verified purchases
“I was quoted $300 by a local estimator. This gave me the same breakdown for $20. My contractor confirmed every number was accurate.”
“The labor vs material split saved me from being lowballed on framing. I knew what everything should cost before anyone gave me a quote.”
“Uploaded my floor plan, it read the rooms and pre-filled everything. Got my full estimate in 4 minutes. Numbers matched my architect exactly.”
Ready to know your numbers?
No contractor. No waiting. No guessing.
$19.99 one-time · Instant PDF · No subscription